North Saskatchewan Bank Stabilization
Erosion Control was required for a bank stabilization project within the Edmonton River Valley. We used a Green Armour system where R45 matting is applied and Flexterra with seed sprayed over to enable re-vegetation. Along with the there were a few hundred smaller trees and shrubs that would have naturally grown on the slope to aid in the regrowth of the area.